Access to the entire school
Wheelchair students could not reach part of the school before. The new lift now gives disabled access to the entire school.
Case Study
Transformation
Before this project, the first floor at Balaclava State School could only be reached by stairs, so wheelchair students were unable to access part of the school. MyBuild Commercial built a new lift shaft and installed a through car passenger lift alongside the existing walkways, with new hardwood landings and cladding to match the school.
Under a minute on how the new lift and covered walkway opened up the whole school to wheelchair users, built while classes carried on.
Project Brief
The Department of Education engaged MyBuild Commercial to deliver accessibility and infrastructure upgrades at Balaclava State School, including a new passenger lift and improvements to the school’s covered walkway network.
The works included the lift shaft and associated structural, electrical and drainage works, installation and commissioning of a vandal resistant passenger lift and two new landings. A separate covered walkway was built over the existing access path, connecting the stop, drop and go area to the school’s covered areas. The school stayed in session for the entire build, and the project was completed in two and a half months.
Key Features
Wheelchair students could not reach part of the school before. The new lift now gives disabled access to the entire school.
A through car lift with stainless steel powder coated finishes, a 630kg capacity and an emergency phone, built for daily school use.
The lift shaft is clad in a custom green profile so it sits naturally alongside the existing school buildings.
Two new landings finished in hardwood decking with galvanised balustrades, tying the lift into the existing walkways.
A new covered walkway over the existing access path connects the stop, drop and go area to the school's covered areas.
The school was in session for the whole build. The crane lift for the lift install was carefully planned and scheduled outside of hours.
The Result