New passenger lift tower connecting the elevated walkways at Balaclava State School

Case Study

Balaclava State School Lift and Accessibility Upgrade

Project Type: Commercial, Accessibility Upgrade
Project Status: Completed August 2026
Client: Department of Education
Location: Balaclava State School, Westcourt

Transformation

From stairs only to a lift that reaches every level

Before this project, the first floor at Balaclava State School could only be reached by stairs, so wheelchair students were unable to access part of the school. MyBuild Commercial built a new lift shaft and installed a through car passenger lift alongside the existing walkways, with new hardwood landings and cladding to match the school.

Stair only access to the upper level walkways at Balaclava State School before the lift
New lift tower with custom green cladding at Balaclava State School
Before After

Watch the Balaclava school lift project

Under a minute on how the new lift and covered walkway opened up the whole school to wheelchair users, built while classes carried on.

Project Brief

Safe, compliant access across the whole school

The Department of Education engaged MyBuild Commercial to deliver accessibility and infrastructure upgrades at Balaclava State School, including a new passenger lift and improvements to the school’s covered walkway network.

The works included the lift shaft and associated structural, electrical and drainage works, installation and commissioning of a vandal resistant passenger lift and two new landings. A separate covered walkway was built over the existing access path, connecting the stop, drop and go area to the school’s covered areas. The school stayed in session for the entire build, and the project was completed in two and a half months.

  • New lift shaft with structural, electrical and drainage works
  • Vandal resistant through car passenger lift
  • Two new landings with hardwood decking
  • Custom external cladding to match the school
  • Emergency phone and 630kg lift capacity
  • New covered walkway from the stop, drop and go area
  • Crane lift for the lift install scheduled outside school hours
Upper lift landing with hardwood deck and balustrade overlooking the school

Key Features

What was included in the upgrade

Access to the entire school

Wheelchair students could not reach part of the school before. The new lift now gives disabled access to the entire school.

Vandal resistant passenger lift

A through car lift with stainless steel powder coated finishes, a 630kg capacity and an emergency phone, built for daily school use.

Custom external cladding

The lift shaft is clad in a custom green profile so it sits naturally alongside the existing school buildings.

Hardwood landings

Two new landings finished in hardwood decking with galvanised balustrades, tying the lift into the existing walkways.

Covered walkway

A new covered walkway over the existing access path connects the stop, drop and go area to the school's covered areas.

Built around a working school

The school was in session for the whole build. The crane lift for the lift install was carefully planned and scheduled outside of hours.

The Result

A durable, low maintenance solution for students, staff and visitors

Project Status Completed August 2026
Location Balaclava State School, Westcourt
Scope Lift and covered walkway in 2.5 months
Sector Commercial, Education